Engineering

Accepted CAD formats are STEP, IGES, X_T, DWG, and PDF. Critical dimensions should be annotated on the drawing so tolerance intent is clear before quoting.

Prototype testing timelines depend on part geometry, material, and finishing. Your engineering contact will confirm the schedule after drawing review.

Tooling

Production tooling lead times vary with mold complexity and cavity count. Mold ownership terms are agreed in writing before tooling begins.

Minimum order quantities are set per part and process, and are confirmed in the quotation.

Shipping and payment

Export packaging is specified for each shipment. Material test reports can be provided on request for supplied materials.

Payment terms and mass delivery schedules are confirmed with the commercial quotation.

Still have a question?

Send your drawing or specification and our engineering team will reply.